Breaking Ground
What is Breaking Ground?
Breaking ground refers to the official start of construction on a project, typically marked by the initial digging into the ground. It’s the first step toward site preparation, which involves various tasks, like soil testing, land clearing, excavation, leveling, etc. The term originates from the literal act of "breaking" or disturbing the ground to begin foundation work.
Breaking ground marks the transition from pre-construction activities (permitting and design finalization) to actual building work. This is when project timelines become essential to track, material deliveries need coordination, and subcontractors start mobilizing their teams and equipment to the job site.
Once its time to start building, it’s time to start billing. Siteline helps subcontractors streamline their pay app and lien waiver processes, eliminating bottlenecks that can hold up payments for faster payments. Learn more about Siteline.
Trusted by trade contractors across the country












Other construction terms
What is a Request for Information (RFI)?
A Request for Information (RFI) in the construction industry is a formal process through which a party involved in a construction project request details about a document or a process. It acts as a vital communication tool between multiple project parties such as the general contractor, subcontractor, and the design team. This is generally used to resolve information gaps, make decisions or track project changes. The main purpose of an RFI in construction is to eliminate any ambiguity, introduce a control mechanism, avoid unrealistic project expectations and ensure that all participants have a clear understanding of the project. It assists in minimizing project risks and avoids potential disputes related to design issues, cost overruns or schedule delays. It's an essential element in maintaining transparency, effective communication and collaboration within a construction project.
What is a Time and Materials Contract?
A Time and Materials Contract, often abbreviated as T&M, is a specific type of contract commonly used in the construction industry. It is a contractual format that indicates that the client will pay based on actual costs: the direct labor hours worked (time), the materials directly used in the final product, and a fixed add-on to cover overhead and profits. Unlike fixed-cost contracts, T&M agreements provide greater flexibility as the scope of work can change without having to negotiate a new contract. This type of contract is generally applied in projects where the full extent of the work cannot be determined at the outset. However, their major downside is the potential risk of cost overruns, which makes client oversight crucial.
What are Canned Reports?
Canned reports are predefined reports that provide information about various construction processes. Unlike ad-hoc reports—which are customized each time they’re run—canned reports follow standard layouts and include pre-set fields that provide consistent information on an ongoing basis. Subcontractor account teams can set these fields to include data related to project progress, labor costs, equipment utilization, material usage, safety incidents—anything that they frequently compile for their analysis or are required to report to other stakeholders.
The key benefit of canned reports is having regularly scheduled visibility into key metrics and insights without recreating the same reports and analyses each time. This enables subcontractor accounting teams to focus less on compiling data and more on strategic analysis and monitoring. Furthermore, they provide quick, comprehensive visibility into a company’s financial processes to help accountants identify issues early on, analyze costs and variances, validate invoices, and ensure compliance on an ongoing basis.
Canned reports are typically generated from construction project management or accounting software. However, when it comes to accounts receivable (A/R) and billing reporting, Siteline takes the cake. With Siteline, subcontractors can easily:
- View the status of all their pay apps—filterable by various project details—to stay on top of collections.
- Track and compare GC payment times and benchmark their performance to inform bid prices.
- Analyze overhead costs and cash flow health to optimize financial performance.
- Evaluate A/R performance by office and project manager to identify successes and opportunities.
See for yourself! Schedule a personalized Siteline demo today and learn how our A/R and billing reporting capabilities can strengthen your construction business.