When Drew Turner joined Cooper Steel nearly 10 years ago, the family-owned structural steel fabricator and erector had about 150 employees and 50–60 active projects. Today, it has close to 800 employees managing around 90 active projects at a time, with shops in Tennessee, Alabama, Virginia, and Ohio.

Meanwhile, the finance team grew from just nine people to 16 over the same stretch. That slower growth was intentional, with Drew and his team focused on building the right systems and processes to scale the business without expanding the back office at the same rate.

In this episode of Billing & Chilling, Drew joins Claire Wilson to walk through how they’ve done it. Much of it comes down to how closely finance works with project managers, from how the team is structured to the meeting they share every month. They also get into what it takes to manage cash on massive, material-heavy data center jobs, where costs hit long before payment does.

Drew's main takeaway is that systems help, but the real advantage is people who trust each other and are willing to adapt.

What You'll Learn

  • Why the right systems can do more for a growing finance team than new hires
  • Why Cooper Steel moved to a project accountant model, and what changed for PMs
  • How monthly billings and cost review meetings keep projections accurate and train younger PMs
  • How to plan material purchasing and stored-material billing so you’re not fronting the cost
  • How Drew and his team approach retainage reductions on long data center projects
  • When it makes sense for them to take a job with thinner margins

‍

Episode Timestamps

  • 00:10 – Meet Drew Turner
  • 03:14 – Cooper Steel’s Growth and Expansion
  • 04:08 – Maintaining Efficiency with a Lean Finance Team
  • 06:27 – The Benefits of the Project Accountant Model
  • 08:32 – Getting PMs Involved in Job Finances
  • 10:43 – What Makes a Great PM on the Financial Side
  • 13:31 – Building a Strong Bond Between Finance and Ops
  • 15:55 – Cross-Training PMs and Coordinators
  • 18:23 – Managing Cash Flow on Large Steel Projects
  • 21:22 – Why the Schedule Drives Everything on Data Center Jobs
  • 23:47 – Asking for Retainage Reductions
  • 25:12 – When a Lower-Margin Job Is Still Worth It
  • 26:47 – What Growth Teaches a Finance Team
  • 29:13 – Every Leader Is a "Chief Energy Officer"

Key Takeaways

  • Give each PM group one point of contact in finance. Cooper Steel assigns a project accountant to each group of PMs to handle billing, budgets, cost tracking, and change orders on their jobs (A/P stays separate). With fewer projects to cover, each project accountant can really learn the details, and PMs always know who to call with questions.
  • Make your monthly meeting with PMs count. PMs are constantly on the go, so Cooper Steel combines billing and cost review into one monthly meeting. They walk through what each PM plans to bill, including stored materials, and clear any open budgets or questions so PMs can trust their cost reports.
  • Cost to complete matters more than cost to date. Reviewing past costs is only half the job. Projecting how each project will finish, including pending change orders, profit pickups, and overruns, helps finance forecast where the books are headed through year-end.
  • Let younger PMs hear the hard conversations. At Cooper Steel, junior PMs sit in on monthly cost reviews to learn how the team tackles tough decisions, like when to accrue a loss or recognize a profit. Hearing these discussions firsthand has helped them become more confident in raising red flags early.
  • Plan material billing before the steel arrives. At the start of each job, the PM, coordinator, purchasing agent, shop manager, and project accountant align on material purchasing, delivery, and billing schedules. Stored-material billing is also negotiated upfront in the contract.
  • Keep asking for retainage back. Once a project hits a certain percentage billed, Cooper Steel asks whether retainage can drop from 10% to 7.5% or 5%. It doesn't always work, so the team also plans for retainage it knows won't come back for 18 months or more.

Transcript

View full transcript

Claire (00:10)
Okay, welcome back to Billing & Chilling, the podcast where we sit down with the people who live and breathe the business of subcontracting to talk about what it actually takes to build a stronger construction business. Joining me today is Drew Turner, executive vice president and controller at Cooper Steel, a family-owned structural steel fabricator and erector that has grown tremendously during Drew's nearly 10 years with the company. Drew is a CPA who started his career in public accounting before joining Cooper Steel, where he's had a front-row seat to the growth and what it takes to support it financially. Today we're gonna dig into some of what Cooper Steel has learned along the way, from building a finance team that can scale to managing cash flow, retainage, and the complexities that come with increasingly large projects. Drew, welcome to the show. We're so excited to have you.

Drew Turner (00:55)
Thank you for having me. Looking forward to it.

Claire (00:57)
So you started your career in public accounting before making the jump to Cooper Steel. What drew you to construction, and what was the business like when you first joined?

Drew Turner (01:06)
So yes, I did three years in public accounting, primarily in the manufacturing, distribution, and construction space. It's basically what I started off and learned first, and it was always intriguing. Working through job schedules and contract confirmations, things like that, I always found pretty interesting. So that definitely laid the groundwork for the opportunity that I had at Cooper Steel.

Claire (01:28)
Nice. And I know you have some connections with the family. Honestly, I had the joy of visiting the office in Nashville, and I was like, I gotta hang up Siteline and go work for this company. This is incredible. It feels like an obvious, happy place to work.

Drew Turner (01:46)
Yeah, we appreciate you saying that. We try hard for that. So I'll get into a little bit longer story here. Three years of public accounting. At that time, I was traveling a lot, which I volunteered for. I always have to have that caveat. I volunteered for that and got to go to some really cool places along the way. But at the same time, I'd gotten married and lived about 50 miles away from the office, so driving back and forth when we were in town was starting to take a toll. I was studying for the exam, so just a lot of things going on in my life. And I was starting to say, okay, what opportunities are in Shelbyville? What could I do here? Jordan Cooper, our CFO, is one of my longest friends. We were actually down at the beach together one time, and I was like, hey, I'm looking at job opportunities in Shelbyville. At that time, I had not even thought about Cooper Steel. It wasn't even on my radar. Fortunately, I think he took that conversation and went back and talked with his dad. So probably a month later, he said, hey, what do you think about coming to work for us? At this time, Jordan was full-time in the business, Corey had already been in the business for a few years, and Gary Cooper, our CEO, of course was very involved. I was like, man, yeah, sure, that sounds awesome. I met with Jordan and Gary one day, and they were like, we need some support on the job cost side and helping project management. It was an easy choice once they offered me a spot, and man, it's just been a fantastic ride. Forever grateful for that beach conversation and that lunch.

Claire (03:14)
That's amazing. And what did the company look like when you joined? I know it's been a tremendous success story.

Drew Turner (03:22)
Sure. So project-wise, we were probably doing 50 to 60 projects active at a time, and we've jumped up to probably 90 projects active at a time now. We were talking about it this morning. There were about 150 people employed then between the shop, the field, and the office. And I think now we're getting close to 800 across shop, field, and office. We have a shop in Childersburg, Alabama, a shop in Lynchburg, Virginia, and of course we have our operations here in Shelbyville. We recently acquired a shop in Batavia, Ohio. So we're still expanding, trying to increase our footprint and increase our influence. As you mentioned, it's a great company. We want as many people to be a part of it as we can get. So we've really grown.

Claire (04:09)
But with all that growth, I feel like your team has been able to stay relatively lean on the finance side. How have you been able to stay so efficient with the back office group?

Drew Turner (04:19)
Scale with our systems. That's probably buzzwords for people in our industry, or across all industries really. But we've been able to incorporate some good systems and software that have helped us in our day-to-day. When I got here, I think our staff was nine, and we've grown to 16. So relative to the company, not a whole lot.

Claire (04:38)
Yeah. Proportionately to the company growth.

Drew Turner (04:41)
Right. So systems like Siteline have allowed us to maximize our efficiencies across our processes. And we're far from a finished product in that regard, too. We're trying to evolve and enhance that every single day. But yes, the systems we're utilizing have made it easier to scale without having to hire a bunch of people.

Claire (05:06)
Well, you also just have an incredible group. I have met so many different finance teams at this point with different subcontracting companies, and yours is so open-minded to new tools and solutions that can help. I remember when I met the team, Dana gave me a big hug and was like, this product's really gonna help us, and we're excited to take this on. It's just such a good group.

Drew Turner (05:30)
Yeah, well, I'd say shout-out to you, because three of my employees went to the TUG conference in Louisville. I guess it's probably been four or five years ago, and you were demoing and talking about Siteline. Jennifer Hatchet, my senior manager of financial accounting, and Ginny Edmundson stopped, and Hatchet, short-form name Hatchet, said, hey Ginny, I think this is exactly what you're looking for. And sure enough, it was. But yeah, my team's open-minded. There are some things we do because it's the way we've always done it, but at the same time, we're very open to trying new things, evolving, and figuring out the best way to do things. I'm thankful for that, because that's allowed us to grow and evolve, provide more opportunity amongst the team, and really become a valuable asset to the company. We're a competitive bunch, so we like to say we're the best department in the company. We're working towards that every day, to be that for everybody.

Claire (06:27)
And you guys made a recent shift where you moved away from separate A/R and job cost groups, and now you have project accountants who handle both for a dedicated group of PMs. Why did you make that change? What works better about the project accountant model, and what would you suggest to contractors listening to this?

Drew Turner (06:43)
Yeah, so Ginny Evanson, she's my assistant controller, and she's in charge of projects. We were sitting and talking, and we had a hard time with just, if I wanted to know about a specific project, specific details, we'd still have to go dig for that stuff. And we're like, there's gotta be a way that we can spread the load out amongst individuals on the team and have them be responsible for all things in a certain set of projects. That way, we can go ask the question: hey, what's going on with this job? What's our over/under billing situation? What do our profit margins look like? Are we getting our change orders, all the things? Are we getting our billings out? At that time, we had A/R, we had the start of what I'll call job cost back then, but really the start of our project accounting, and then of course we had our A/P function over here. So it was like, okay, we have two people in A/R and two people in job cost project accounting. And maybe this is unique for us, but we have four groups of project managers for our company. So I'm like, well, we have four people. That's how we can spread the load. Let's put one project accountant with each subgroup of the business unit, and they'll be responsible for that subset of jobs, all things: billings, budget entry, cost tracking. Payables are still separate, but billings and everything contract-related, the project accountants handle. So it gives a smaller set for individuals within our team to really hone in on the details and become experts in what they're looking at. So far, it's been really successful. Our project management side tells us they love it, and I feel like they're being honest when they tell us that. It allows us to service a smaller group of people more efficiently and more effectively.

Claire (08:32)
How involved do you guys want project managers to be in the financial side of their projects?

Drew Turner (08:38)
It's important. We rely on them to give us a good picture of how the job's shaping up and how they project it's going to finish. We do a lot of projections. And this is really cool and something that we've evolved over the years, but we meet once a month and do a cost review with our project management teams, a cost review slash billings meeting. Each project accountant has their group that they're in charge of. We'll start by going through what each project manager is going to bill for the month, what they expect to bill, whether or not they're going to have stored material billings, kind of all the details around their billings, due dates, things like that. And then the PAs will have a list of things they need, whether it be a change order budget, a job budget, or any kind of question they have. We cycle through those and get all that tidied up, because our project managers are on the go all the time.

Drew Turner (09:27)
So for us, we want to be very effective with that hour, hour and a half that we get with them each month to go through all the details. That way, when they go look at their cost reports, they can trust that all their information's good, everything they're looking at is right and accounted for, and it's exactly the way they want it. But from there, we do a cost review. That's twofold. It's analyzing cost to date, all the things that have happened throughout the life of the project so far. But then also, and what I would say is more important, projecting our cost to complete, projecting out how we think all these projects are going to finish. What is our change order outstanding list? How much of our CORs do we expect to get? We talk through profit pickups or overruns. We never like to have an overrun, but sometimes we do, so we'll talk through overruns so we can go ahead and start budgeting for that stuff. With the projections, I take that information and translate it over into the financial side. It allows us to feel good about where our books are headed, what our financial statements are saying, and how they're going to project through the end of the year. So to us, it's very important that our project managers are involved on the cost side, because ultimately they know their buyouts, and they know how the project's going. They can give that information to us, and we can make good decisions based on that information.

Claire (10:43)
So what separates a good from a fantastic project manager as it relates to managing the finances on a job?

Drew Turner (10:53)
That's a good question. Experience. That's a cop-out answer, but a lot of times, and we're seeing this because we have a really young population of project managers, which is awesome, they've also got thrown into the fire immediately because we're just so busy right now. So they're learning at super speed. It's the experience of our guys and girls that have done it for a long time, knowing, hey, these are your buyout items, this is the money you've spent, this is the money you have remaining based on your purchase orders or your subcontracts. Based on this and any change orders that are out there, how do you feel like this is going to finish? Somebody that can really look at the cost details and know exactly what's going on. That's what we're trying to train all these guys and girls up for. The ones that are experienced and have been doing it a while, they've kind of got it down to a science. Our leadership in those groups is fantastic. Guys and girls that have been here 10-plus years, that have been doing this for a long time, they know what's going on. They know how to look at these reports and do their projections. So now we're just passing that knowledge down to the younger group.

Claire (11:57)
Something that also comes with that experience, I feel like, is the confidence to be able to communicate when something isn't trending in the right direction and raise the red flag of, hey guys, there's a problem on this project. When you're younger in your career, you're a little nervous and trying to fix things and quietly brush things under the rug. I feel like that's a big one.

Drew Turner (12:17)
Yeah. Well, that's been what we've done, really, by adding the cost review, because that used to be a separate meeting. Adding the cost review onto the billings meeting, it's now one meeting, and it's allowed the younger project managers to stay in and listen to the cost review. Our model there is that they give their managers their details, anything they want reported on their job. In the past, the manager would have come to present the details, and the manager still presents, but they would have been in a room with just the finance side. Now the manager still presents, but the other project managers, if they're able, can stand there and listen and hear what questions are being asked. Why is this important? If we have an overrun, what do we need to do? Do we need to start accruing the loss? Is it something that we can kind of kick down the road because we've got changes out there and we think we might be able to recoup some money? If it's a great job and we've got potential pickup, what's our timeline on the pickup? Can we spread it out over time? Just things like that. I think it's opened their eyes to seeing that obviously their main job is getting the building built, but secondary to that, it's having a good understanding of the finances of their projects and the implications that has on the company.

Claire (13:31)
It's amazing how much you guys invest in the growth of the individuals at your company. I think it's something that makes Cooper Steel so special. We work with some clients who will be like, I don't want the project managers to see the financial side of the job. I just want them to provide percentages complete. And I'm like, I feel like the best way to make a project manager successful is to give them the full picture. Everyone should be working towards the same thing, keeping tabs on the budget and making sure that we're trending in the right direction from a margin perspective. So I think it's great that you guys are kind of bear-hugging the project management team from a finance perspective and keeping them in the loop.

Drew Turner (14:09)
And it allows opportunities for teamwork, too. That's important around here. My team loves communicating with that team. That's an opportunity for them to communicate with people outside of our office and really have an impact. To me, it strengthens relationships across the company. I would say the bond between our project management staff and the accounting staff, and I'd say this is rare and something that we certainly take pride in here, is really strong. Even in the moments where we disagree. I'll use an example: hey, you wrote a change order up at 5%, and I know there's really 10% profit in there. Why are you holding back some money? We can have difficult conversations and then come to an agreement of, well, I'm holding it back because of X, Y, and Z. And like, okay, that makes sense. Or, what happens probably more often than that, is if a billing gets rejected or a draw gets opened up at the eleventh hour and my staff might be gone for the day, the project manager can take comfort in calling their project accountant. They've developed such a good relationship that the project accountant will want to get in and do that work for them. Not because they have to, but because they want to. They want to help their counterpart on the project management side. They want to make sure that project manager is successful. So we've really built that culture here, and we're really proud of that. It's something we try to cultivate every day.

Claire (15:27)
And I think the mutual respect is really important, too. There are some scenarios where finance and ops, I feel like, are on opposite sides of the table, and it's like, you didn't give me this on time. Sometimes ops may see finance as just a means to getting all the paperwork done for this project, and it always kind of bums me out. So it's nice to see the team working together, supporting each other, and respecting the work that the other side is doing. When I started my career at the general contractor that I worked for, part of my training was that my boss had me do a rotation in each department, because he was like, someday, when you work your way up the ladder and you're a project executive and you're asking an accounts receivable person to put together a pay application in 10 minutes for a deadline, you'll have the respect and understanding of what goes into that and the work that it takes to do these things. It's something I've tried to carry on throughout my career, with everyone that I manage now at this company really having a deep understanding of what they do, and respecting and appreciating that.

Drew Turner (16:35)
That's really cool, because you mentioned Dana earlier. That's exactly what we do. Within the last four months probably, we've developed a project manager and also a project coordinator training. So basically, a new project manager, relatively new, will come down. I think our threshold is if they've been in the office six months or maybe even longer, so they've actually done some of the stuff. We're not just showing them so they can go forget it once all the craziness starts happening. They've actually done the job. Then they come down and sit with Dana for, gosh, three hours probably, and go through all the things that are important for the accounting side of it. From there, they go into our operations building and sit down with our purchasing group and our sub-fabrication group. So to your point, they're getting an understanding of what the other departments are doing, why it's important, and how we all work together to ensure every job is delivered safely and as it should be. So far, our feedback's been great. And like I said, with the project coordination team, each project manager has a project coordinator. Our PAs are helping on the finance, accounting, and budgeting side, and the coordinators are handling a lot of the day-to-day operations for our project managers. But they do commitments and things and interact with my accounts payable team a lot. So now we've developed the same type of training for that group to come down and sit with the A/P team and other teams while they're down here and really learn: hey, this is why this is taxable, this is why this is not, this is what this commitment means. And then the flow of everything, and why it's important that once invoices start trickling in, the flow is correct on the front end. That way, everything on the back end goes as it should.

Claire (18:23)
Yeah, absolutely. Love it. Okay, pivoting a little bit. Steel obviously requires a tremendous amount of cash long before a project is finished. How do you structure purchasing and billing to keep that from putting unnecessary pressure on cash flow for the business, especially on these mega jobs that you're working on?

Drew Turner (18:42)
Sure. So for each project, we'll have a schedule, and we know our project milestones: when we need to be procuring material, when we need to start billing. From the very jump, when the project managers send us their budget for the project, it prompts my team of project accountants to do what's called a turnover meeting. In a turnover meeting, we get the project manager, coordinator, the purchasing agent, the subfab manager, and the project accountant, and several people on my team will join those meetings. We get the game plan from the paperwork side of, okay, what's this look like? We're going to start buying steel, and we may place orders several months in advance. But until the steel is delivered, that's when we start getting an invoice. So we've got to figure all that out, whether that's a longer time frame, or whether it's shorter and the material is going to go somewhere and be stored until it's time to be fabricated. We talk through those details in that turnover meeting, and then we get that game plan and go forward from there. Once material actually starts moving and we're being invoiced, we bill the customer for stored material. That's built into our contract negotiations, that we're going to bill stored material based on whatever the schedule is. For that stored material, we'll have to provide a lot of different backup to substantiate the amounts we're billing to the GC and the owner. Especially with the lead times as they are now, which have really expanded, stored material is a pretty critical part of what we do, and getting a good schedule early on in the life of the project is super critical to what we're doing.

Claire (20:14)
Yeah. And it's the best for the whole project, because if you guys are waiting until the last minute to order materials because you don't wanna have to float the cost for too long, then you run the risk of impacting the schedule of the job. So it's in the interest of everybody. Let's buy this material early, we're gonna bill for it as stored materials as soon as possible, and we shouldn't be forced to front the cost of all this material.

Drew Turner (20:39)
Yeah, sure. There are always kinks to it, but for the most part, we've got it down to a pretty good science. It's just making sure we stick to the schedule, which is critical. And then if schedules slip, obviously we have to pivot and really be on our game: okay, well, how does this change things? Another thing we've started doing is the projections in Siteline. As part of this turnover meeting, our project managers go in and fill out their billing projections, and that's something we analyze, too. As the schedule slips, they go back in and change those projections to reflect what has changed. That gives us a good idea of where we're going, because we know what our monthly volume is going to be and where we need to be to feel good about cash flow and all the things.

Claire (21:22)
It's interesting, because we work with this mechanical contractor that's based in DC, and his brother is a glazing contractor also in DC. And he's like, we make the same amount of revenue, but I have like 200 jobs and he has like 10, and it's so unfair. I feel like for you guys, you work on a smaller number of jobs than people would probably expect given your size, but they're massive, massive jobs. There are benefits to that, but there are also a lot of challenges. Like you said, when a schedule changes on a massive job like that and you have all the labor planned out and you purchased equipment for the project... What are some of the different challenges that you face with some of these massive data center projects that you're working on, in terms of managing cash flow and billing on projects of that size and duration? And any tips you have for folks taking on some bigger jobs?

Drew Turner (22:12)
Yeah, so the good thing for us is that, especially on data center campuses, it's basically one building at a time. It's sequenced out in such a way that's advantageous for us, and probably for all the other trades, too. Again, I'm gonna go back to scheduling. That's gonna be kind of my buzzword here, but the schedule is so important. Getting that initial schedule, and then when there are changes, coordinating that with everybody that's involved, not only internally but externally with our partners. It's communicating what the schedule changes are and what the new expectations are. From a billing standpoint, being able to bill for stored material allows us to get in front of the cost. That part's critical, and ultimately we feel like we do good enough there that it gets us in a good position for the project. We've got great customers. I'd say that proudly. We have good relationships with those customers, and with several of them, we're able to call up and ask, hey, these are our outstanding payables, what's it looking like for you? When do you think these will be paid? That's what Dana does. You've interacted with Dana enough to know how engaging she is. That's her role. She's communicating with the contractors and inquiring about payment and any compliance items that we need to have done. So we stay engaged with our customers, too, and they understand that we're not just asking for money to ask for money. We're trying to plan and make sure that everything within our control that can be done is being done to make sure that our cash flow is staying timely, and that we're not falling behind on any projects. And when we do fall behind on projects, we just analyze it and adjust. That's really all you can do.

Claire (23:47)
For retainage, which can be 10% of your contract value and might take years for you to collect, sometimes that's the entire profit on the job. What tips do you have to maybe get retainage a little bit quicker out of your clients? Are you guys doing anything from a contract negotiation perspective?

Drew Turner (24:08)
Yeah, we push from multiple fronts. We try to get what we can in negotiations. But let's just say a job's holding 10%. When we get to a certain threshold of percent billed on a project, we start to ask, hey, is there any possibility of a reduction in retainage? Can we go from 10% to 7.5%? Can we go from 10% to 5%? Whatever. And we've had pretty good success with that. Again, we have great customers. We push on our side, and we push on the project management side. And it's different. Every data center campus is different, and certainly every contractor's different. Sometimes we have success in getting reductions, and sometimes we don't. So again, it's staying flexible and planning for the ones that we know are not going to get reduced until 18 months from now. We know that, so we can plan for it.

Claire (25:01)
And for any GCs listening, if you want a really incredible contractor to continue following you around and pursuing work with you, make a difference in terms of how quickly you pay them and your retainage terms. So you guys obviously have really great relationships with your clients, and I know you follow clients to different places. But we also talked about pursuing work with new clients and filling gaps in a shop schedule. How do you evaluate projects with new clients that you haven't worked with before to decide whether or not it's worth it for the business to take? And how do you decide when a lower-margin job is still good for the business?

Drew Turner (25:37)
Yeah. So obviously, we want our shops to be full 100% of the time. Given trends or the timing of things, some projects we take to make sure that the shops are full, and that's just the way it needs to be sometimes. Otherwise, if we're trying to break in with a new customer, or even a new industry, our preconstruction team analyzes those challenges and any risks that we may have, and they communicate back to ownership. Ultimately, I feel like we make a good group decision on what opportunities to pursue. It helps that ownership is very much involved in these day-to-day decisions, which is awesome, but they also empower us to make decisions. We've got a really strong preconstruction team. They know where we can be successful and what we can be successful in. And they also know that sometimes it's this job to get the next job. Eventually that good opportunity is going to come, and we want to go put our best foot forward with these guys now to show what we can do, knowing that eventually that opportunity is going to come down the road when it's going to be mutually beneficial for us all. We'll put our good reputation out there that we can be the best steel guy that they can have.

Claire (26:47)
Sadly, I think one of the reasons contractors fail is often growing too fast, or taking on bigger projects before you're prepared, or breaking into a market that you don't really know. What has all the growth and success that you've seen taught you about what a finance team needs to get right before the business reaches its next level? What do you think you guys have learned from this process?

Drew Turner (27:13)
You learn as you go. Honestly, you can always think that you're prepared, and then something's gonna happen. I keep using flexibility, too, but you've gotta be flexible. You've gotta be willing to adapt, because about the time you get something figured out, something changes, and then you've got to refigure it out. That's a testament to the people that we have working in this company, that we're able to do that, because we've certainly been strained through this growth. It's never easy, but some years have been easier than others. We have taken on large projects, and we have done more volume as far as just number of projects, so there's certainly strain involved in that. But I go back to the dedication of our team and the hard work that everybody puts in: the willingness to collaborate, the willingness to do the hard stuff, and ultimately being invested in the growth and success of the company. I think that's from the top down. Everybody has that mentality. So that's a really cool thing, to know that we can grow and strain and get to new places, but ultimately we're better for it and more prepared because of it. It's only going to help us down the road as we continue to grow, because we don't have any intention of slowing down. That's allowed us to get more experience for everybody and more opportunity for everybody. And I think the future is exciting.

Claire (28:37)
Yeah. I love the competitive energy at Cooper Steel.

Drew Turner (28:40)
Yeah, there's certainly that.

Claire (28:43)
I think a good takeaway is that there are always gonna be things that are out of your control, whether it's lead times changing or project start dates moving. But it seems like the theme, and the most important thing that we're taking away from this, is your people. Invest in your people. Make sure they respect each other, deeply understand their responsibilities, can learn from each other, and continue to grow. I feel like you guys are just so dynamic and flexible, and that's done wonders for you as you've scaled this business.

Drew Turner (29:13)
Yeah. And if any of my team listens to this after the fact, they're gonna give me a hard time about this, but there's a book called The Energy Bus, and I highly recommend it for anybody listening to this to go read that book. It's a short read. It's the 10 rules to fuel the ride of your life. Basically, the bus driver gives her bus riders 10 rules to maximize their life, and the gist of it is to bring positive energy. If you read it multiple times, you'll think about somebody different each time, which I also think is really cool, because I've read it five times at this point, I think. But there's a rider on the bus that was a CEO of a company, and the bus driver termed that person the chief energy officer for that company. When I think about that, I think about Gary, because that's really what he is. He's chief people person. He's chief energy officer. He's driving the energy for the group at the top, and it just trickles down. So it's part of my job, and part of the job of all the other leadership in the company: hey, you're kind of the chief energy officer for your group. You're driving the positivity, the desire to work hard, the desire to do better, to do more. It's very much a thing.

Claire (30:23)
Wait, what's the name of the book again?

Drew Turner (30:25)
It's called The Energy Bus. I bought like seven or eight copies and left them in my office, and it was kind of a library system. They had to come check it out and go read it. So in different parts of the office, there are different references to the book. If nothing else, we laugh about it, but it makes people think. So honestly, that's all it's meant to do.

Claire (30:46)
Yeah. We spend a tremendous amount of time at the office and away from our families, and we should make sure that it's a positive experience for everyone. You guys have themes in your Nashville office, and each conference room is a different musician. Are there any fun themes in the Shelbyville office?

Drew Turner (31:01)
So this building's been added onto a few times, so it's kind of a piecemeal building, and you just get a different vibe as you go into different parts of the building. No fun themes like the singer-songwriter names on the conference rooms. I think ours here are SVO 1 and SVO 2, or something along those lines, but that's okay.

Claire (31:25)
You gotta spice it up a little bit in that office.

Drew Turner (31:27)
Right, yeah. So going back to competition, we got our brackets for our cornhole tournament that starts next week. We're a highly competitive group down here.

Claire (31:38)
Do you guys do a fantasy football league or anything like that?

Drew Turner (31:42)
Well, funny story. We've got several reality show buffs in the accounting group. So here lately, we started with the last season of Survivor, and they did a draft of the participants. Zach Taylor, one of our IT guys, has a point system developed. Evidently, he and his family have been doing this for several years, and he has a point system based on all the different Survivor activities. So we've started drafting participants of reality TV shows and having different competitions based on that, and it's become a cool thing. It's been a small group so far, but we've been able to go to lunch and do a draft. Again, it's just something to take some time away from work to go do something that's cool, and then we get to come back and talk about it. We basically have these debriefing sessions the next day after the show. Dancing with the Stars is the one that we're doing now. It just started, I guess, Monday night or Tuesday night. So we've got a group chat now about Dancing with the Stars. It's just simple ways to interact and do something that's not related to work, but ultimately it continues to build relationships. So there's a lot of that down here that's pretty cool and pretty unique.

Claire (33:03)
That's awesome. I love it. We do an icebreaker whenever someone joins the company at our all-hands, so it'll be company-wide, and they have to say what reality show they would thrive in.

Drew Turner (33:16)
Yeah, that's awesome.

Claire (33:18)
Yeah, it's funny. Cool. Well, Drew, thank you so, so much for your time today. I really appreciate it. I'm sure all of our listeners loved learning about Cooper Steel. Maybe you're gonna have a lot of people applying to jobs after this episode. Thank you so, so much for your time.

Drew Turner (33:33)
Yeah, it's my pleasure. Thank you for having me.

‍

Guest Bio

Guest headshot
Drew Turner

Drew Turner is the Executive Vice President and Controller at Cooper Steel, a family-owned structural steel fabricator and erector based in Shelbyville, Tennessee. Drew is a CPA who spent three years in public accounting, working with manufacturing, distribution, and construction clients, before joining Cooper Steel nearly 10 years ago.

He has supported the company's growth from about 150 employees to nearly 800 and oversees a 16-person finance team across accounting, project accounting, and A/P.

Connect on LinkedIn

Links & Resources

Table of Contents

Ready to take the stress out of billing?

See how Siteline helps commercial subcontractors streamline billing, stay ahead of collections, and get paid faster.
many forms with different layouts